Material Management
Fully Linked Material Management System Provides A Rapid Response to Project Needs




  • Vendor alliances for optimum pricing and delivery

  • Design tools integrated with material management

  • Project-specific procurement

  • Positive Material Identification (PMI) systems

  • Quality inspections



We bag, tag, and deliver materials to work stations precisely when needed.
 

We extract Bills of Material from the PDS model, eliminating the potential for errors from duplicate data input.

 
  Overview | Engineering | Material Management | Structural Frame Assembly | Blast and Paint | Assembly | High-Purity Pipe Fabrication | Barge Loading