Barge Loading
Barge Access – Larger Modules Maximize Benefits of Modular Construction



Access to sites around the world direct or through the Port of Charleston

  • Global experience base

  • 600-ton loadout capacity

  • Transport by proven heavy hauling firms

  • Roll-on access for barge loading

  • 1,000 feet of frontage with water depth of 20 feet




 
Pharmaceutical modules en route to the Puerto Rico job site.
 
  Overview | Engineering | Material Management | Structural Frame Assembly | Blast and Paint | Assembly | High-Purity Pipe Fabrication | Barge Loading